INSTALLATION
Physical Installation
Physical Installation
Risk of severe injury or death.
•
When lifting or moving heavy components, use suitable lifting equipment, in good condition, rated for at least 5 times the
weight of the materials being moved.
•
Operate the VFD with door closed and locked at all times.
•
Placing the skid on an uneven location can create a tipping hazard.
Risk of bodily injury or property damage.
•
Pumps can develop very high pressure in some situations. Always install a pressure relief valve able to pass the full pump
flow.
•
Install the pressure relief valve near the pressure tank and route to a drain capable of full system flow.
•
Ensure that the foundation is rated to accommodate the operating weight of the package and that it is sized sufficiently for
the weight and loads the package will experience.
•
Do not over tighten piping connections on the fittings used to connect the site plumbing to each header as this could dam-
age the equipment and/or headers.
Risk of damage to equipment.
•
The drive electronics are air-cooled. Do not block fan vents or components may overheat.
•
Placing the skid on an uneven location can create a tipping hazard.
•
Do not remove the HMI cover or leave open for extended periods of time. This can result in damage to the screen.
1.
Place skid on a flat, level surface, clear of rocks and debris under the skid.
•
Refer to
"Environmental Requirements" on page
•
Refer to
"Lifting" on page
2. If applicable, connect level float switche(s) to the system.
•
To complete configuration, refer to
3. If applicable, connect a control transducer to the system for autonomous operation into Analog 1 on the
sensor input panel.
•
Refer to
"Transducer Application Setup" on page
8
7.
6.
"Float Control Configuration" on page
17.
17.