Descargar Imprimir esta página

klover SOFT 80 Instrucciones Para La Instalación, El Uso Y El Mantenimiento página 57

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 116
COMMISSIONING AND USE
Commissioning and use
7
INITIAL SETTINGS
7.1
REGISTERING THE PRODUCT
Once the product has been installed, the user must register it.
The registration entitles the user to a 2-year warranty as well as pro-
motions and specific services (for example: discounts on spare parts,
facilitated conditions for testing or maintenance, etc.).
Simply access the Web page shown below or scan the following QR
Code using your smartphone.
https://garanzia.klover.it/it/registrazione_prodotto
7.2
CONNECTING THE REMOTE CONTROL
Whenever the remote control is switched on or its batteries are re-
placed, of if user wishes to change the connection channel, the re-
mote control should be interfaced with the support panel mounted
on the device. To do this, follow the guided procedure on the remote
control after inserting the batteries.
The full instructions for pairing the remote control with the appliance
can be viewed by scanning the following QR Code with your smart-
phone.
https://docs.klover.it/it/guide/help/cs-radio-ist
7.3
CONNECTION TO THE WI-FI NETWORK
The appliance is equipped with a Wi-Fi board that enables it to be
remotely controlled via the "Klover Home" app, which can be down-
loaded to smartphones or tablets from various stores (Apple, Android,
etc.).
To connect the appliance's Wi-Fi board to the domestic network, pro-
ceed with the operations described below:
- power the appliance through the main switch
- download and install the "KLOVER HOME" app on your mobile de-
vice
- launch the app and select "Add Stove" then follow the guided pro-
cedure.
CS.SB80.IST_EN_Rev. 2.0_09-23
The full instructions for installing and using the Wi-Fi module inte-
grated into the appliance can be viewed by scanning the following QR
Code with your smartphone.
https://docs.klover.it/it/guide/help/cs-wifi20-ist
8
COMMISSIONING
8.1
PRELIMINARY CHECKS
l
Before commissioning the appliance:
carefully read all the documentation accompanying
the product and any supplementary accessories
make sure that all the indications provided by the
manufacturer and specified in the regulations are
observed
make sure you have completed all the necessary
cleaning and maintenance operations of the product
and the system.
a
The commissioning must be MUST BE made by qual-
ified personnel, who must:
perform a switch-on and operation check to verify
that the product and all associated and involved ele-
ments of the system work properly
verify any ducting systems for hot air, if present,
or for the hydraulic system and for any other heat
sources associated with the product.
8.2
INITIAL START-UP
l
Before proceeding with the operations described be-
low, consult the chapter
a
Before starting-up the product:
check that the brazier is properly positioned in its
seat and is pushed towards the ignition hole part
(this only applies to products without a self-cleaning
brazier)
check that the firebox door is tightly closed and
that the pellet tank is full, or nonetheless contains
enough fuel for operating the product for the desired
duration; if not, follow the instructions given under "
Loading the
fuel".
Ignition
cycle.
EN
19

Publicidad

loading

Este manual también es adecuado para:

Soft 100ObloSuper 7Super 9