Before You Begin
WARNING: Risk of serious injury. When cutting and drilling, wear safety glasses and use breathing protection.
CAUTION: Risk of personal injury. For ceiling panel installations, install the ceiling panel and allow the adhesive
to cure before installing the wall panels. The ceiling could fall during wall panel installation if curing time is not
sufficient.
CAUTION: Risk of product damage. The wall panels should be room temperature before cutting. Allow the
temperature to stabilize if the walls were in a cold environment.
IMPORTANT! Dust will be generated when cutting the wall panels and locker unit. Cut the walls and locker outside or in
a well ventilated area.
IMPORTANT! For best results, cut the walls according to the instructions included with the wall panels.
IMPORTANT! Leave this manual for the end user.
Read these instructions before installing or using this product.
The locker unit must only be trimmed in height. Do not cut down the sides.
Verify that the existing rough walls are within 3/8" (10 mm) of plumb.
The locker unit must be braced using 2x4's around the entire unit.
Use color matched silicone sealant in the seams and joints.
Cover the shower base with a drop cloth or other protective material to avoid damage.
Follow the adhesive and silicone sealant instructions for application and curing time.
Inspect all components for damage after unpacking, prior to installation.
A router may be used to cut the walls and locker. The router bit will dull quickly.
If the wall panels are being installed over existing tile, scuff the tile using 100 grit sandpaper for better adhesive contact.
If installing accessories, install 2x4 backing for handrails, shelves, and hooks and 2x10 backing for the flip-down seat.
Kohler Co.
3
1484881-2-A