Descargar Imprimir esta página

Kohler K-97630 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installation With Ceiling Panels (Optional)
CAUTION: Risk of personal injury. For ceiling panel installations, install the ceiling panel and allow the adhesive
to cure before installing the wall panels. The ceiling could fall during wall panel installation if curing time is not
sufficient.
NOTE: Two people are required if installing a ceiling panel.
If the ceiling will be covered with the panel material, measure and cut the ceiling panel to size.
Construct bracing or use commercial bracing to hold the ceiling material in place while it cures.
NOTE: Polyurethane based adhesive is recommended for the ceiling panel.
Apply adhesive specified in the wall panel instructions to the ceiling material as shown in "Install the First Wall Panel"
section.
With another person, carefully lift the ceiling panel into place.
Brace the ceiling panel tight against the ceiling and allow the ceiling panel to cure following the adhesive instructions.
Kohler Co.
7
1484881-2-A

Publicidad

loading