19. Seal the Enclosure
IMPORTANT! For better adhesion success, allow the panels to cure 24 to 48 hours before performing the final steps.
Sealing the top and bottom will restrict air flow, resulting in longer curing time.
Apply sealant to the top seams where the panels meet the rough wall.
Apply sealant to the bottom seams where the panels meet the bath or shower base.
NOTE: Wait 24 hours before showering or running water.
Remove the tape from the locker unit once the adhesive and sealant on the locker unit and wall panels have cured.
Kohler Co.
23
1484881-2-A