Descargar Imprimir esta página

Corsair PLATFORM 6 Manual Del Usuario página 23

Publicidad

Power Strip Installation
6 6
The 3-port power strip can be installed in multiple locations with the included brackets.
It can clamp to the desk itself (1), or attach to the rail system (2). 
1
Clamping the power strip to the desk.
2
Attaching the power strip to the rail
system.
x1
SCAN ME
Check out our online
assembly guide at:
corsair.com/platform6build
Locate the clamp where you prefer, and
secure using the large hand dial until
firmly mounted, then plug into wall or
long power strip.
Insert two black T-nuts into BACK of
rail, but do not secure yet.
I
H
x1
x1
OR – if you want to mount it to the rail
system, loosen the center screw and
slide the mount plate off the power strip.
Align mounting bracket holes with the
T-nuts. If desired, once aligned, you can
then tighten the T-nuts with the set
screw. Otherwise, use the M6 bolts to
loosely secure the mounting bracket.
E1
B
x2
x2
Finally, slide the power strip onto the
rails from the open side. Secure all screws.
Tighten the center screw to keep the
power strip from sliding.
Y
x1

Publicidad

loading

Este manual también es adecuado para:

Cf-9500053-eu