Descargar Imprimir esta página

Hitachi PSC-A32MN Manual De Instalación Y Funcionamiento página 58

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
Operation
5.3.3.2 Holiday setting for suspending operation
1 Select "Schedule Settings" at the "Menu" screen.
2 Select "Holiday Setting" at the "Schedule Settings" screen.
(2)
3 Select the target (all groups, block or group). The calendar for the selection is shown.
The buttons of the groups with holiday setup are shown in blue.
The buttons of the groups with no holiday setup are shown in grey.
?
N O T E
"Holiday" means that operation is suspended for the entire day.
4 Set the date to suspend the scheduled operation.
Browse the calendar forth and back by tapping "<" or ">".
By tapping on a date in the calendar, it is set as "Holiday" and marked with " ". The "Holiday" setting is cancelled by tapping on
the same date again.
Holiday setting is disabled for days before the current day.
The days with holiday setting are marked with " ".
When "All Groups" or "Block" have been selected, the " " mark indicates those days when there are groups with holiday settings
mixed with groups with no holiday settings.
5 Tap "Setting Completed" to confirm the contents of settings and return to the "Select Holiday Setting group" selection screen.
6 Tap "Submenu" at "Holiday setting" selection screen to return to the "Schedule settings" screen.
50
PMML0332A rev.0 - 05/2015
(4)
(5)
(3)

Publicidad

loading