Converting to Side Discharge (continued)
New hex bolt—5/16 x 3/4 inch (2)
Existing nut—5/16 inch (3)
7. Remove the 2 kicker baffles and install the fasteners into the open holes.
Kicker baffle (2)
8. Install the battery packs.
Operation: Before Operation
G468164
Existing carriage bolt—5/16 x 3/4 inch
G468337
Thread-forming bolt—5/16 x 3/4 inch (4)
Page 4–7
3445-793 A