Descargar Imprimir esta página

Beissbarth MT ZERO 6 Touch Manual De Instrucciones página 94

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

en
94 | MT ZERO 6 Touch | Initial commissioning
4.
Initial commissioning
4.1
Unpacking
1. Place the packed goods near the installation
location.
i
Use an appropriate fork lift or a pallet truck (with
a minimum load capacity of 400 kg) to move the
packed machine. Insert the forks between the
support legs of the palette and lift the packaging.
2. Remove the strap and retaining clamps from the
pallet and the packaging carton.
3. Carefully lift off the packaging.
4. Take the standard accessories and the packaging
material out of the transport crate.
i
Check if the MT ZERO 6 Touch and the accessories
are in proper working order and that there are
no visible signs of component damage. In case of
doubt, do not commission the device and consult
customer service.
i
Dispose of the packaging material at an appropriate
collection site.
4.2
Transporting an handling the wheel
balancing machine
i
On delivery, the machine is fastened to the pallet.
Fig. 6:
MT ZERO 6 Touch on pallet
1. Remove fastening screws.
2. Move the machine from the pallet to a suitable
position intended for installation.
|
1 695 600 965
2020-02-27
i
At least 2 people are needed for this job.
!
Do not lift the machine for transport by the shaft
or measurement system. That area must not be
subjected to impacts or potential damage.
Fig. 7:
Places by which the machine must not be lifted for
transport
!
Do not hold the machine by the plastic covers
for moving or lifting. Otherwise, there is a risk of
damage during handling or transport.
3. Carefully position the first side of the machine and
make sure that the machine is in balance and cannot
tip over.
Fig. 8:
First step of setup
4. Pull out the pallet from under the machine, and
position the machine carefully.
Fig. 9:
Second step of setup
Beissbarth GmbH

Publicidad

loading