Descargar Imprimir esta página

Calpeda NCE HQ2 Instrucciones De Uso página 39

Bombas circuladoras de bajo consumo energético

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
9.Initial startup and operation
9.1 Before start
Warning
Before starting the electric pump, make sure the system is full of liquid, air has
been completely removed, and the inlet of the electric pump must reach the
minimum inlet pressure.
9.2 Evacuate the pump
The electric pump is vented through the system, which must be vented at the highest
point. The air in the electric pump can be noisy, which will disappear after a few minutes
of operation.
9.3 Start-up products
Step
1
2
3
Measures
Turn on the power of the
water pump, the water pump
will start after about 5
seconds.
After the factory, the LCD
display needs to select the
language setting for the first
start-up, but no need to select
for later start-ups.
This menu allows you to return
to the default settings, which
set the control mode to
AUTO ADAPT
38
Illustrations
GB

Publicidad

loading