Descargar Imprimir esta página

SKF 90010-00 Instrucciones De Uso Y De Mantenimiento página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

Prime pump
NOTE
Air purge valve (25) is located on
casting Release air after new cartridge
is installed
1 Remove any dirt or debris from cavity (23)
(→ Fig. 11) of casting
2 Fill cavity (23) with grease before installing
grease cylinder (1)
3 Install grease cylinder (1) onto pump
housing (3) and tighten
4 Loosen purge valve (25) (→ Fig. 12) and
push in cylinder rod handle until grease
begins to flow through purge valve (25)
5 Disengage rod from follower by rotating
follower handle
NOTE
Verify rod is engaged with follower
6 Push follower rod into cylinder (1)
7 Prime AECP pump after each refill or
grease cartridge change
1
24
23
1
25
15
Fig. 11
Fig. 12

Publicidad

loading