6.8 Reinstall the electrical control box cover and front panel.
Fig. 13 key:
1.
Front panel
2.
Wiring diagram
3.
Control box cover
Step 7. Wrap the tubes and cable
Once the refrigerant pipes, connecting cables and drain hose have been installed, to
save space, protect and insulate them, they should be tied with insulating tape before
passing them through the hole in the wall.
7.1 Arrange the pipes, cables and drainage hoses, as well as figure 14.
NOTE:
(I) Make sure that the drain hose is at the bottom.
(II) Avoid crossing and bending the pieces.
7.2 Wrap the coolant pipes, connecting cables and drain hose tightly with the
insulating tape. Fig. 15
Fig. 14 key:
1.
Connection cord
2.
Electrical tape
3.
Coolant piping
4.
Drain hose
Step 8. Mount the indoor unit
8.1 Slowly pass the coolant pipes, connecting cables and the bundle of wrapped drain
hoses through the hole in the wall.
8.2 Hook the upper part of the indoor unit onto the mounting plate.
8.3 Apply light pressure on the left and right sides of the indoor unit, make sure that
the indoor unit is securely latched.
8.4 Push down the bottom of the indoor unit to let it hook onto the hooks of the
mounting plate, and make sure it is hooked firmly.
Sometimes, if the refrigerant pipes were already embedded in the wall, or if you want
to connect the pipes and cables in the wall, do the following:
I.
Hook the upper part of the indoor unit onto the mounting plate without pipes
and wires.
II.
Lift the indoor unit in front of the wall, unfold the bracket on the mounting plate
and use this bracket to prop up the indoor unit, there will be a large space for
EVVO CLIMA 9000/12000/18000/24000
ENGLISH
97