Descargar Imprimir esta página

Alemite 7886-S5 Guía De Servicio página 19

Bomba de material de acero inoxidable de presión intermedia

Publicidad

Idiomas disponibles

Idiomas disponibles

Pump tube assembly 327675-5 - section view
1)
Observe hole in packing screw for solution overflow. Packing screw may be loose and/or worn or damaged V-packings may exist.
2)
Fill cavity of packing screw with product soluble solution. Prevent product from drying on piston
3)
Use flats of bung adapter to hold pump in vise to prevent damage to cylinder.
4)
Measure these distances during the assembly process. Dimensions effect pump performance.
17
18
19
20
21
22
A
27
26
10
0.23 in (5.8 mm) min
0.26 in (6.6 mm) max
29
30
B
28
33
34
35
0.15 in (3.8 mm) max
36
37
38
22
39
B
40
31
32
19
Fig. IPB 3
15
9
10
12
11
13
16
14
A
22
23
25
24
26
10

Publicidad

loading