2) Lift the ring on the adjustable pyramid adapter slightly until it no longer
engages in the serrated surface (see fig. 3).
3) Set the desired displacement and press the ring back down on to the
serrated surface.
4) Connect the pyramid adapter with the applicable connecting component
(see fig. 4).
Mounting the Second Connection
6A53
Required tools and materials:
>
710D4 Torque Spanner, 636K13 Loctite® 241
► Connect the pyramid adapter with the applicable connecting compon
ent.
6A54
Required tools and materials:
>
710D4 Torque Spanner, 636K13 Loctite® 241
1) For definitive mounting:
Use Loctite® to secure the grub screws.
2) Screw in the grub screws.
3) For trial fitting:
Use the torque spanner to tighten the grub screws (tightening
torque:10 Nm).
For definitive mounting:
Pre-tighten the grub screws with the torque spanner (tightening torque:
10 Nm) and then tighten (tightening torque: 15 Nm).
4) Replace any grub screws that are protruding or recessed too much with
suitable ones (see selection table).
Reference number
506G3=M8x12-V
506G3=M8x14
506G3=M8x16
6 Maintenance
•
The prosthesis components should be inspected after the first 30 days of
use.
•
Inspect the entire prosthesis for wear during normal consultations.
•
Conduct annual safety inspections.
12 | Ottobock
Selection Table for Set Screws
Length (mm)
12
14
16