70
AVENTICS | DeviceNet | R402003659–BAL–001–AG
Commissioning and operation
Table 11
S4 switch assignment
Switch
S4.1
Power supply control byte 1
S4.2
Power supply control byte 2
S4.3
Power supply control byte 3
S4.4
Power supply control byte 4
1)
Examples
Subbases used
Example 1
Subbases for double solenoid valves
Example 2
Subbases for double solenoid valves
Example 3
Subbases for double solenoid valves
1)
You can also arrange other combinations based on your requirements.
At delivery, all switch positions are set to position 1.
Voltage on switches
Switches can be damaged if voltage is applied to them during operation.
O
Always operate switches in a voltage-free state!
How to assign the valve supply:
O
Using the S4 switch, assign one of the two supply voltages U
U
Q2
Function
The following example combinations are available for the assignment of
the S4 switch and the supply of assembled valves for 32 valve solenoids
in Table 12.
to each valve group (see Table 11 below).
Position 1 (down)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
NOTICE
Position 2 (up)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
Valve equipment
Double solenoid valves
Single solenoid valves
Single and double solenoid valves
or
Q1