Gima SPOT-CHECK PC-300 Guía De Uso página 85

Ocultar thumbs Ver también para SPOT-CHECK PC-300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

85
To obtain a clear and high quality ECG signal, the lead wire measurement can be used. Connect
the lead wire firmly to the lead wire socket of the device. Place the electrodes and connect the
lead wires as shown in Figure 2.10E to obtain the Lead II ECG signal. If you want to measure
Lead I and Lead III ECG signal, connect the lead wires to the electrodes (Note: lead wire is op-
tional) as detailed in table below.
 Safety Instructions for ECG Measurement
1. Check the device to make sure that there is no visible damage that may affect the user's sa-
fety and the measurement performance. If there is obvious damage, stop using the unit.
2. Do NOT make a diagnosis of oneself according to the measurement and measurement resul-
ts, always consult a doctor if abnormal information is presented frequently.
3. Do NOT use the device in a bathroom or humid environments.
Figure 2.10E Lead wire measurement
ENGLISH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

35162

Tabla de contenido