13 Appendix A: Installation Protocol
• Copy the installation protocol, fill it in and save it as a service record.
• For values, note the value in the resuJClt column, otherwise, a tick will suffice if the item has been performed
or considered.
If a value is outside the limit or a result is incorrect or missing, this must be rectified before the initial
start-up and normal operation.
Unit number
 
Description
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight
Access for maintenance
(0.7 m in front of unit)
Mounting (check availability)
Maintenance switch
Installation room, ventil-
ation openings
Dust collector
Duct system
Pilot-start cable (option-
al)
Start and control unit
Exhaust air duct directed
away from the unit
Compressed air
Airlines cleaned
Air pressure
Clean and dry air (ISO
8573-1, class 5)
24
VAC 20
Date
Reference
Section 5.1 Delivery check
Section 5.1 Delivery check
Section 5.2.1 Location
Section 3.1 Technical data
Section 5.2.1 Location
Section 4.2 Connections
Section 6.1.1 Indoor installation
Duct collector manual
Section 4.2 Connections
Section 4.2 Connections
Start and control unit manual
Section 6.1 Installing VAC 20
Section 6.1.4 Compressed air installation
Section 6.1.4 Compressed air installation
Section 6.1.4 Compressed air installation
Performed by
Result
Notes