Mounting and installation instructions
7) Insert the cable glands (surface-mounted cable insertion) or double-
The charging station is now ready for installation.
To mount the charging station, proceed as follows:
1) Mark the 4 holes
Fig. 6-14: Drilling template
2) If there is a cable holder, mark the cable holder holes
3) Drill boreholes and, if necessary, insert anchors in the holes.
280
membrane seals (flush-mounted cable insertion) into the corresponding
cable insertion openings.
1
in the designated location on the wall. The supplied
drilling template can be used for this purpose.
1
... Mounting holes
3
... Cable holder holes
1
... Washer for adjusting
3
... Washer for nut
5
... Hanger bolt
2
... Cable insertion openings
3
.
2
... Rear wall of the charging station
4
... Nut
x
... 20 mm
Installation manual V1.05
xChargeIn
© EATON