5.2.4.
Main Zone Area
Scroll to select an approximate area (EU- m² / US- ft²) for the
•
Main Zone, where the Base Station is installed.
If an additional zone (Sub-Zone or Separated Zone) exists,
do not include it in main zone's area (it will be set
separately).
Note - It is necessary to complete the above settings (5.2.1 –
5.2.3) in order to operate the mower. Every press on the STOP
button will change the screen one step back in the process.
5.2.5.
Test Base Station Position
After setting the area, U001 (Test Base Station Position) is
•
displayed.
Place the unit inside the lawn, approximately 3 m (10 ft.) in
•
front of the Base Station, facing the Perimeter Wire and
press OK to start the test.
The unit drives towards the Base Station:
•
If the unit does not start the test, then one of the
following messages will be displayed:
E3 (No Wire Signal) – Confirm that the Power
Box is connected to the power outlet and that
the Extension Cable is connected at both ends,
from the Power Box to the Base Station.
U029 (Swap wires in plot connector) – The
Perimeter Wire has been connected in the
opposite direction. Swap the wires at the plot
connector.
The unit will enter the Base Station, drive back, wait in front
•
of the Base Station, and display U002 (Peg Base).
If U051 (Reposition Base Station) message is
displayed:
• Move the Base Station slightly to align it
with the Perimeter Wire.
• Check for any obstacles that may interfere
with the mower's entrance to the Base
Station.
While 'U002' (Peg Base) is displayed, insert the remaining
•
Stakes of the Base Station to secure it to the ground and
press OK.