To Remove The Jumper Cables; Tire Pressure - Husqvarna P 520D Manual De Usuario

Ocultar thumbs Ver también para P 520D:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WARNING: Do not short circuit the ends
of the red cable against the chassis.
5. Connect one end of the black cable to the
NEGATIVE battery terminal (-) on the fully charged
battery (C).
6. Connect the other end of the black cable to a
CHASSIS GROUND (D), away from the fuel tank
and the battery.
7. Replace the covers.

To remove the jumper cables

Note: Remove the jumper cables in the opposite
sequence to how you connect them.
1. Remove the BLACK cable from the chassis.
2. Remove the BLACK cable from the fully charged
battery.
3. Remove the RED cable from the 2 batteries.

Tire pressure

The correct tire pressure is 150 kPa (1.5 bar / 21.7 PSI)
on all 4 tires.
To put the cutting deck in service
position
1. Obey steps 1–13 in
page 114 .
132
To remove the cutting deck on
2. Remove the service stay from the cutting deck.
3. Attach the service stay to the red attach point below
the bottom plate.
4. Pull the pin on the other end of the service stay.
Attach the service stay to the red mark on cross tube
on the cutting deck.
5. Start the engine.
6. Set the cutting height lever in the service position.
7. Attach 1 end of the the safety straps around the pipe
adjacent to the steering column.
740 - 002 -

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

P 525dP 525d with cabin

Tabla de contenido