7. MOUNTING THE POWER CORD BRACKET
Parts Required:
1
x
Power Cord Bracket (#10)
2
x
Screw ( #D)
Installation:
•
Locate the two holes on the bottom of the (left side) support panel. Mount
the power cord bracket to the support panel using two screws, as shown in 7A.
•
Next, loosen the nut on the pre-mounted clip bracket and guide the power
cord through the clip bracket. Once through, tighten the nut, and wrap the
power cord on the bracket until unit is in use. Note illustration 7B, 7C.
8. SECURING THE GREASE TRAY BRACKETS
Parts Required:
2
x
Grease Tray Brackets (#17)
4
x
Screw ( #D)
Installation:
•
Secure the grease tray brackets onto the base of the auger housing and
the wire components housing using two screws in each bracket. Note
illustration for proper placement.
NOTE: The diveted end of the brackets should face the control board.
•
Fully-tighten all screws on the cart base. Next, carefully turn the unit into
an upright position, with the wheels on the bottom. Ensure its level.
9. PLACING THE GREASE TRAY
Parts Required:
1
x
Grease Tray (#16)
Installation:
•
Slide the grease tray into the grease tray brackets on the front underside of
the main cabinet, under the control board.
NOTE: The grease tray is completely inserted once the front of the tray
is pushed in as far as it can go, with no gap between the grease tray and
the front panel.
10. ATTACHING THE HOPPER CLEAN-OUT DOOR KNOB
Parts Required:
1
x
Door Knob (#A)
Installation:
•
Attach the door knob to the hopper clean-out door by rotating the part
into the hole on the door. Rotate until completely fastened and clean-out
door latch is secured.
NOTE: To use the hopper clean-out feature, simply loosen the door knob,
raise the clean-out door latch and open the door.
7A
7B
10
D
D
7C
10
8
D
17-2
9
FRONT
10
17-1
16
A
9