Remove bolt (E) from protective cover;
5.
Lift the protective cover (F);
6.
Fit the inverter tool (G) to the gearbox
7.
shaft end
Using your hands, turn the inverter tool in
8.
the direction shown in the illustration. The
feeding rollers will rotate in the opposite
direction to the working direction,
expelling (throwing out) accumulated
material into the platform. Rotate until
all material is removed.
After the "unclogging", remove the
9.
inverter tool (G) and store it;
Lower the protective cover (F);
10.
Fit the bolt, the two flat washers and the
11.
nut (E).
G
Instructions Manual
5. Operation
F
E
79