Nogueira NEW PECUS Duo G2 Manual De Instrucciones página 214

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Maintenance
Lift the lock (N), loosen the spindle (O) and
9.
remove the pin (P).
Carefully articulate the platform to the
10.
side (figure beside).
Repeat the above procedure to articulate
11.
the other platform.
To return the platforms to the working
12.
position, perform the procedure in
reverse order.
86
Instructions Manual
N
O
P

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido