VTrak S3000 Task List
•
Task 1: Unpacking the Boxes (below)
•
•
•
•
•
•
•
•
•
•
•
•
•
Thank you for your purchase of the VTrak S3000 storage solution. This Quick
Start Guide is designed to help you unpack, install, connect, configure, and run
your VTrak S3000 system.
If you are adding VTrak RAID subsystems or JBOD enclosures to your VTrak
S3000 system, follow the Task List in this document. The Task Lists in other
Quick Start Guides do not cover VTrak S3000.
For complete information about your VTrak S3000 appliance, see the VTrak
S3000 User Manual on the software DVD.
Please see the software DVD for a complete set of user documents.
Task 1: Unpacking the Box
The VTrak S3000 appliance box contains the following items:
•
VTrak appliance
•
Bezel
•
Left and right mounting rails for the appliance
•
1.5 m (4.9 ft) Power cords, 2 each
•
Accessory box
•
Printed software license key
•
DVD with software install files and user documentation
3
Task 1: Unpacking the Box