Task 9: Powering-on the Subsystem

Plug the power cords and turn on the switches on both power supplies.
When the power is switched on, the LEDs on the front of the VTrak light up.
Figure 13.VTrak front panel LED display
When boot-up is finished and the VTrak is functioning normally:
Controller LED blinks green once per second for five seconds, goes dark for
ten seconds, then blinks green once per second for five seconds again.
Power, FRU and Logical Drive LEDs display green continuously.
Controller LEDs flash green if there is activity on that controller.
There are two LEDs on each disk drive carrier. They report the presence of
power and a disk drive, and the current condition of the drive.
Always power on the JBOD enclosures first. Then power on the
RAID subsystem.
Task 9: Powering-on the Subsystem
Important
Power
FRU Status
Logical Drive Status
Controller-1 Activity
Controller-2 Activity
Controller Heartbeat