9 OPERATION
9.1 MANUAL OPERATION
CAUTION!
Before opening or closing the circuit breaker equipped with an undervoltage release, a control voltage must be applied.
9.1.1 Manual loading
1. Operate the rod 7 to 8 times with complete movements.
2. When the closing spring is fully loaded, the load indicator shows "LOADED".
9.1.2 Manual closing
1. Press the ON key.
2. The circuit breaker will close.
3. The ON/OFF indicator shows "ON" and the load indicator shows "LOADED".
9.1.3 Manual trip
1. Pressing the OFF key will trip the circuit breaker.
2. The ON/OFF indicator shows "OFF".
32 | ABWC Compact Air Circuit Breaker
Loading rod
Figure 9.1:
Figure 9.2:
Figure 9.3:
O and loaded