Electrical Connection; Connection Of Compressed Air/External Extractor; Filling With Test Oil; Eps 205 Software Installation And Language Selection - Bosch EPS 205 Manual Original

Ocultar thumbs Ver también para EPS 205:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 104
en
54 | EPS 205 | Commissioning
1
2
3
4
6
5
Fig. 37:
Removing transportation safeguards
1 Hexagon nut
2 Transportation safeguard
3 Transportation safeguard
4 Bolts
5 Housing cover
6 Bolts
1. Unscrew the bolts (8x) securing the left housing
cover (Fig. 37, item 6).
2. Detach the housing cover (Fig. 37, item 5).
3. Remove the hexagon nuts (2x) of the transportation
safeguard (Fig. 37, item 1).
4. Remove the bolts (2x) of the transportation
safeguard (Fig. 37, item 4).
5. Remove the transportation safeguards (2x) (Fig. 37,
item 2 and 3).
6. Re-fit and secure the housing cover.
i
Keep the transportation safeguard and bolts for
further use. The EPS 205 is only to be transported
with the transportation safeguard fitted.
4.5

Electrical connection

!
The EPS 205 is only to be connected with a three-
phase AC connector to a grounded symmetrical
three-phase AC network (400 V). The EPS 205 must
be provided with 16 A fuse protection. Heed the
information on the rating plate on the back of the
EPS 205.
Plug in the EPS 205 at the three-phase AC network.
|
1 689 989 185
2018-03-24
1
2
3
4
4.6
Connection of compressed air/
external extractor
1. Set the compressed air on the service unit to
between 0.5 MPa and 0.8 MPa.
2. Connect the compressed air supply on the back of
the device (Fig. 2, item 2).
3. If use is being made of an external extractor, this is
to be connected to the outlet (Fig. 1, item 4).
i
We recommend connecting an oil mist extraction
and filtering unit to the EPS 205.
4.7

Filling with test oil

!
If it is poured in too quickly, the test oil may run out
at the turned-up flushing drain or at the connection
for external extraction.
1. Connect flushing outlet (1 680 712 293; fig. 3,
item 6) and face upward.
2. Pour test oil (ISO 4113) very slowly and carefully
into the jet chamber (Fig. 3, item. 4). The capacity of
the test oil tank is approx. 6.5 liters.
3. Pour in test oil until it is above the mark on the oil
level indicator (Fig. 1, item. 8).
 The EPS 205 is ready for operation.
i
After testing DHK/UI or CRI/CRIN, CRI Piezo for
the first time, the level on the oil level indicator
drops as the test oil is distributed in the hydraulic
pipes of the EPS 205. Check the oil level after first
testing and top up if necessary. If the level is exactly
on the mark of the oil level indicator, a maximum
of 1.5 liters of test oil can be added. The oil level
should always be above the mark but remain within
the inspection port.
4.8
EPS 205 Software installation and
language selection
4.8.1
Install Windows 7
1. Switch on the EPS 205 with the main switch.
 EPS 205starts, and the installation of Windows 7
also starts.
i
During installation of Windows 7, you will be asked
to create a username and a password. The username
must be entered. The password is not necessary
to operate EPS 205. To enter the username, either
connect a keyboard to a USB or the PS2 port on
the EPS 205 (see sec. 3.6.5) or open the virtual
keyboard.
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Tabla de contenido