Preparing the tool
Connecting the compressed air hose
The tool can be connected to a compressor or a compressed air
system.
Operation with a compressor or compressed air system is only
permitted under the following conditions:
 The working pressure of the compressor or compressed air
system must not be more than 10% above the maximum working
pressure of the tool of 10 bar.
 If the compressed air system has a higher working pressure, a
pressure control valve (pressure reducer) with downline pressure
relief valve must be installed in the compressed air line.
 The compressed air must be filtered, dry and oiled with
PREBENA special nailer oil.
 An air conditioner must be installed on the coupling side of the
outlet ports for the compressed air line to the tool. This should
comprise
-
a filter,
-
a water trap and
-
an oiler.
 If no oiler is installed, the length of the air line to the tool must not
exceed max. 10 metres. Otherwise pour three to five drops of
PREBENA special nailer oil directly into the air inlet port of the
tool every day before starting work.
 The compressed air system must be able to maintain the working
pressure even with the desired air consumption.
 The diameter of the fixed air lines must be at least 19 mm.
 The connection for the tool must be fitted with a quick coupler
with NW 7.2 and with an inside diameter of at least 6.5 mm.