Install The Rough-In Plate To The Hood; Connect The Wiring - Broan best K260A Manual De Instalación

Ocultar thumbs Ver también para best K260A:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. INSTALL THE ROUGH-IN PLATE TO THE HOOD

Run power cable to
installation location.
Attach blower plate
to the studs at the
inside, top or back
of hood with (4)
#10-32
nuts,
provided.
Install
the rough-in plate so
that the wiring box
is located on the
right side as you
are facing the hood.
For ducting through back of hood, remove existing plate from inside back of hood
and attach to inside top of hood to cover hole. Secure to threaded studs with same
(4) nuts.
For ducting through top of hood, existing plate remains in place on inside back of
hood.
Connect ducting to transition or rough-in plate as you are installing the rough-in
plate. Use duct tape to make all joints secure and air-tight.

9. CONNECT THE WIRING

Risk of electrical shock. Electrical wiring must be done by qualified
personnel in accordance with all applicable codes and standards. Before
connecting wires, switch power off at service panel and lock service
disconnecting means to prevent power from being switched on accidentally.
Remove wiring cover from rough-in plate and set aside.
Remove appropriate knockout from rough-in plate. As you are installing the rough-in
plate, feed 6" of power cable through knockout opening and attach cable to wiring
box with appropriate connector.
Connect BLACK to BLACK, WHITE to WHITE and GREEN or bare wire under
GREEN ground screw.
Reinstall wiring cover.
Blower plate
HD0048
!
WARNING
0
- 7 -
#10-32 nuts
(2 per side)

Publicidad

Tabla de contenido
loading

Tabla de contenido