Descargar Imprimir esta página

Dometic WAECO CoolAir SP-900 Instrucciones De Instalación página 34

Equipo de aire acondicionado split para camiones

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
SP-900-Install.book Seite 34 Montag, 25. Januar 2010 4:53 16
Scope of delivery
4
Scope of delivery
CoolAir SP-900
Part designation
CoolAir SP-900 air conditioning unit
consisting of:
- Condenser unit
- Evaporator unit with connection line
Remote control (incl. type CR2025 battery)
Battery cables 2 x AWG 8
Operating manual
Installation manual
Installation template, evaporator unit
Installation template, condenser unit
5
Installation
Caution
The air conditioner may only be installed by qualified personnel from a
specialist company. The following information is intended for specialists
who are familiar with the guidelines and safety precautions to be applied.
5.1
Prescribed installation method
The condenser unit (see Fig. 1 on page 3, 2) is attached to the firm and
straight rear panel of the cab or by means of a firm fastening frame. The
evaporator unit (see Fig. 1 on page 3, 1) is fitted on the inside of the rear
panel of the cab.
The connection line (see Fig. 1 on page 3, 3) can only be installed after
fitting the evaporator unit and the condenser unit.
The condensation from the evaporator unit is automatically drained off.
This purely physical function is only possible within certain angles of incli-
nation of the cab. Horizontal inclination during operation should not exceed
10°, vertical forward inclination should not exceed 18°.
The lorry's split air conditioner consists of the following components:
No. in fig. 15
34
a
I
Designation
1
Condenser unit
2
Evaporator unit
3
Connection lines
CoolAir
Quantity Item no.
1
9100100002
4442700183
4442700184
1
4441600084
1
4441300097
1
4445100326
1
4445100327
1
see
packaging
1
see
packaging

Publicidad

loading