Activating The Control Unit; Removing The Mattress System - Invacare SoftCloud Ace Manual Del Usuario

Sistemas de colchon de aire alternante
Ocultar thumbs Ver también para SoftCloud Ace:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 117
SoftCloud™ Ace, SoftCloud™ Pro

4.3 Activating the control unit

1. Position the control unit by hanging the hooks over the
foot board of the bed or side rails, ensuring that they
are robust enough to hold the control unit.
CAUTION!
– Ensure the air hose does not kink between the
bed frame and control unit.
2. Connect the mattress connector to the control unit.
IMPORTANT!
– Ensure that the power cord is in good condition.
3. Insert the power cord into the control unit then plug
into a grounded 220V 50Hz electrical outlet.
4. Press the power button for at least two (2) seconds to
activate the control unit.
The pressure LEDs will flash indicating the system
has activated.
14
IMPORTANT!
– Prior to pump activation ensure the CPR valve
located near the head end of the mattress is
fully engaged.
– Ensure that the mattress connector is firmly
connected to the control unit.
5. Allow approximately 30 minutes for the mattress to fully
inflate. Once ready, you should see the fourth pressure
LED plus alternating mode LED illuminate to indicate
that the system is ready for use (system automatically
defaults to Alternating Mode after start-up).
6. Once the Mattress is fully inflated the bedding can be
placed. Fit sheets loosely enough to allow for free
movement of the mattress air cells.
7. Ensure each sheet corner is placed through retaining
buckle.

4.4 Removing the mattress system

A
1630732-A

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Softcloud pro

Tabla de contenido