Balluff BMD 1H Serie Manual De Instrucciones página 98

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4 Mounting
Pressure
Lateral installation
Fasten
16
in chapter "Technical data". Keep in mind for the adjustment that the
default setting for the measuring range refers to water.
the vessel. Before use, check if the seal material is resistant against
the measured product and the process temperature.
data" or on the type label of the sensor.
mounted laterally. For this, adapt the rod with rod extensions or
angled segments.
To compensate for the resulting changes in signal runtime, let the
instrument determine the probe length automatically.
The determined probe length can deviate from the actual probe
length when using curved or angled segments.
If internal installations such as struts, ladders, etc. are present on the
vessel wall, the measuring probe should be mounted at least 300 mm
(11.81 in) away from the vessel wall.
the rod extension.
If there is a risk of the rod probe touching the vessel wall during
operation due to product movements or agitators, etc., the measuring
For this, use an additional plastic sleeve (PTFE, PPS, PEEK etc.), to
protect the probe against damages.
Keep in mind that measurement is not possible below the fastening
point.
1
2
3
Fig. 9: Fasten the probe
1
Measuring probe
2
Retaining sleeve
3
Plastic sleeve (PTFE, PPS, PEEK etc.)
Technical
1
2
3

Publicidad

Tabla de contenido
loading

Tabla de contenido