Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

9 Diagnostics and servicing
60
2
Hole for leakage detection
20 Nm (14.75 lbf ft).
10. Screw the rod carefully by hand into the thread on the process
faces with a torque of max. 4.5 Nm (3.32 lbf ft).
Information:
of the connection remains.
9.8

Software update

The following components are required to update the sensor soft-
ware:
Sensor
Voltage supply
HART modem
PC with PACTware
1
2
3
-

Publicidad

Tabla de contenido
loading

Tabla de contenido