Test Procedures; Instructing The Operator - John Bean B 600 Manual Del Operador

Ocultar thumbs Ver también para B 600:
Tabla de contenido

Publicidad

M4x8 (4x)
1
3
2
148
iii-4
iii-5
4
iii-6
iii-7
Installation
Fitting and connecting the monitor
Fig. iii-4 VESA support
The 4 screws needed (M4x8) to fi x the VESA support
to the monitor are part of the kit supplied.
— Fix the VESA support to the monitor.
Figure iii-5 Monitor power supply unit
— Fasten the power supply unit to the machine back
using the proper Velcro strip.
Figure iii-6 Connection of monitor and PC
Warning
Before connecting any cable turn off the mains
switch.
— Insert the monitor plug (2) in the connection socket
(VGA) of the built-in unit.
— Insert the USB connector (3) into the PC and the
monitor.
— Insert the monitor connector. (4), into the monitor
socket.
— Plug in the plug (1, Fig.iii-5) of the power supply
cable.
Figure iii-7 Monitor cables
— Fasten the monitor cables to the support pole using
the retainers supplied, leaving a suitable quantity in
the upper part to allow the monitor to rotate freely,
as shown in the fi gure.
iv Test procedures
• Balance a wheel to less than 0.25 oz. (5 grams) per
• Balance a wheel until obtaining an unbalance less
plane.
than 5 grams (0.25 oz.) per plane.
• Perform a User Calibration,
v Instructing the operator
(Following applies only if a unit is installed by a
service Technician)
• Show and explain the Safety Booklet.
• Show the operator how to switch the unit on and
off.
• Show the operator how to perform an emergency
stop.
• Show the operator how to select a wheel type, enter
data and apply a weight.
F
6.2.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido