Removing The Mattress System - Invacare SoftCloud Ace Manual Del Usuario

Ocultar thumbs Ver también para SoftCloud Ace:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 111
SoftCloud® Ace, SoftCloud® Pro
4. Press the power button for approximately three seconds
to activate the control unit.
The pressure LEDs will flash indicating the system
has activated.
IMPORTANT!
– Prior to pump activation ensure the CPR valve
located near the head end of the mattress is
fully engaged.
– Ensure that the mattress connector is firmly
connected to the control unit.
5. Allow approximately 30 minutes for the mattress to fully
inflate. Once ready, you should see the fourth pressure
LED plus alternating mode LED illuminate to indicate
that the system is ready for use (system automatically
defaults to Alternating Mode after start-up). For further
details see 5.3 Using the mattress system, page 18.
6. Once the Mattress is fully inflated the bedding can be
placed. Fit sheets loosely enough to allow for free
movement of the mattress air cells.
7. Ensure each sheet corner is placed through retaining
buckle.
14

4.4 Removing the mattress system

C
1. Switch off the control unit and disconnect from mains
supply A.
2. Remove the mattress connector B from the control unit
and disconnect the CPR tag C.
3. Place control unit and power cord on top of the
mattress and detach mattress from the bed frame.
4. Once air has been released from all cells, roll up the
mattress and return all items to the carry bag for safe
keeping.
IMPORTANT!
– Always follow the correct procedure when
switching off the control unit. When the unit
is switched off, it will issue a power loss alert.
This alert can be canceled by pressing the
power button for a minimum of two seconds.
A
B
1630732-B

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Softcloud pro

Tabla de contenido