PVT System
PVT Drying
There may be some instances when water is accidently ingested into the
PVT system. Dry it out before operating.
1. Position the vehicle on a level
surface.
2. Place the transmission in PARK.
3. Remove the drain plug. Allow the water to drain completely.
Reinstall the drain plug.
4. Start the engine.
5. Apply varying throttle
for 10-15 seconds to
expel the moisture and
air-dry the belt and
clutches. Do not hold
the throttle wide open for more than 10 seconds.
6. Allow the engine RPM to settle to idle speed, then shift the
transmission to the lowest available range.
7. Test for belt slippage. If the belt slips, repeat the process.
8. Take the vehicle to your dealer for service as soon as possible.
MAINTENANCE
133