Pentair INTELLIPOOL AUTOMATION Guía De Instalación Y Usuario página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 162
Desinfectant connection
IntelliChlor® salt chlorinator connection inside the Probe unit
1 - Connect the 230V.
2 - Connect the IntelliFlo cable ref 350122 / long 15m provided withg the IntelliPool®.
3 - Connect the green cable on Datas+ and connect the yellow cable on Datas-.
4 - Connect the green cable on the terminal block 2 and the yellow cable on the terminal block 3 of the IntelliChlor® Power center.
3
Chlorine pump connection inside the Control center
1 - Connect the chlorine pump and the chlorine level sensor as descrided bellow. Select «other» in settings menu/install/other, see p16.
NEUTRAL (N)
EARTH
30 mA
PHASE (L)
The injection of chlorine occurs after the filtration, after heating and
after probes location.
Alternative salt chlorinator connection inside the Control center
1 - Connect a classical electrolysis as descrided bellow.
serial connection
10
ELECTROLYSIS FLOW-SWITCH
NEUTRAL (N)
PHASE (L)
10A
The control of the chlorinator is done in series on the flow-switch. The original flow safety
is maintained. Set the chlorinator on maximum level.
1
2
Liquid level switch need to be a normaly open model.
(switch closed = tank empty)
chlorine
Center
communication
of IntelliChlor ®
4
1
2
3
4

Publicidad

Tabla de contenido
loading

Tabla de contenido