Probe unit

The Probe unit collects pH, ORP (RedOx), conductivity and water temperature. These informations are sent to the Control center. The cable length
of the pH and ORP probes is deliberately limited to 50 cm for good readability.
1 : Rubber cover (insulation from acid fumes and humidity)
2 : Screw cover (insulation acid fumes and moisture circulating through the screw hole)
3 : pH probe (0.5m lenght cable)
5 : Conductivity probe (0.9m lenght cable)
REDOX - PH
TEMPERATURE
PROBE UNIT
CONDUCTIVITY
1
2
Install and connect probes
The Probe unit need to be installed close to the by-pass (pH & ORP probes cable is 50cm long)
1 - On a by-pass with siphon, in an analyse chamber, in a bol or 50/63mm PVC, install pH & ORP probes head up, Conductivity probe head down. Water tempera-
ture sensor need to be installed outside the bypass with the hope clamp provided (see detail next page).
2 - Pass the cables through the white gland, connect the cables following marks and screw the white gland.
REDOX - PH
TEMPERATURE
PROBE UNIT
CONDUCTIVITY
- The hydraulic system must be connected to earth so as not to affect the
accuracy of the probes.
6
Conductivity probes bottle
Probe cap
with (screwed on top) = probes out of water
without = probes in the water
pH / ORP probes bottles
3
4
5
6
Distilled
water
- The sensor cables must not cross the
power cable.
- Pentair probe holder
Available in option with the ref.
INTP-HOLD-1.
- Limit the flow to fill the bowl
(1L) in 1 minute.
4 : ORP probe (0.5m lenght cable)
6 : Water temperature probe (2m lenght cable)
Screw up / down the fitted bottles, never push or pull bottles with cap.
3
4
1
2
- Fitting the conductivity probe:
Pass the probe into the probe nut and, 1 - slide O-ring under the probe
nut, 2 - slide the flat seal under the probe nut, 3 - Lower the probe into
contact, 4 - Screw the probe nut until you get a perfect seal after
pressure testing.
- Fitting the pH and ORP probes:
Pass the probe into the probe nut and, 1 - slide O-ring under the probe
nut, 2 - Lower the probe into contact, 3 - Screw the probe nut until you
get a perfect seal after pressure testing.
The conductivity probe cap should not be
used for other probes.
The sensor caps must be filled with
potassium chlorid or failing that tap water.