Installation Depending On The System Earthing Arrangement (Sea); Single Phase Input; Ups With Common Normal And Bypass Ac Inputs; Ups With Separate Normal And Bypass Ac Inputs - Eaton Pulsar Serie Manual De Instalacion Y Uso

Ocultar thumbs Ver también para Pulsar Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 189

Installation depending on the system earthing arrangement (SEA)

Single phase input

UPS with common Normal and Bypass AC inputs

Main low-
voltage
switchboard
(MLVS)
Change in SEA between upstream and downstream or galvanic isolation required
Main low-
voltage
switchboard
(MLVS)

UPS with separate Normal and Bypass AC inputs

Main low-
voltage
switchboard
(MLVS)
Change in SEA between upstream and downstream or galvanic isolation required
Main low-
voltage
switchboard
(MLVS)
* The transformer is not necessary if:
Normal and Bypass AC inputs are connected to the same source,
and wires cross sections and wires lengths on Normal and Bypass inputs are identical,
and upstream protection is provided by only one switch with RCD (residual current device) for Normal and Bypass
inputs.
2. Installation
load
load
load
load
34008486EN/AC - Page 19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pulsar mx frame 15000 rtPulsar mx frame 20000 rt

Tabla de contenido