After the belt has been taken out of operation, the limit boxes and other removed parts can be fitted
back. Screw and fasten the counter nuts on the threaded rods.
§
Switch on the conveyor system and allow the belt to start slowly and carefully running.
§
Pay attention to the proper run of the belt and unusual noises. The belt must not drag along the top of
the belt system, the limit boxes or other parts.
Once all adjustments have been completed, the conveyor system can be put into operation. There should be
no loads on the system while putting it into operation. This is the only way to detect causes of initial start-up
difficulties.
4.3

Commissioning

DANGER
Check the premises before setting up the conveyor system. Flaws can be detected and improved at an early
stage. Observe the following points before setting up the conveyor system:
§
The floors in the premises where the appliance is to be set up must be level and correspond to the
required load-bearing capacity of 0.03 psi [196 N/m²] (4.1 lbs/ft2 [20 kg/m²]).
§
We do not recommend attaching the conveyor system to the floor of the premises with plugs because of
the moisture barrier layer that exists in the most cases.
§
Electrical connections for the conveyor system must be in place as agreed.
The user of the conveyor system must take other measures beforehand to ensure the safety of the operating
staff:
§
Specify the field of application and draw up corresponding safety instructions.
§
Instruct the operating staff in safety.
§
Give the operating staff training.
§
Mark hazardous areas.
4.3.1

Connecting the conveyor system

The following points are to be observed when connecting the conveyor system:
§
Let the power supply be installed properly and ground he conveyor system.
§
Protect power supply cables of the conveyor system against exposure to moisture.
§
In case of unintended reactivation, stop the appliance by using the control system.
In some countries, the technical specifications of the power mains may deviate from those provided in these
operating instructions. Thus, the connecting data of the conveyor system should be harmonized with the
data of the local power mains. Compare the specification given in the rating plate with the local electrical
specifications.
To connect the conveyor system, proceed as follows:
§
Connect the connecting cable with the distributor of the conveyor system.
§
Connect the three-phase motor in such a way that it rotates in a specified direction.
Belt Conveyor System
SGR | SPV
Transport, Installation, Initial Operation and Taking out of Service
Hazardous electrical voltage
Electrical current can pose a considerable threat to life and physical well-
being and may lead to injuries.
Only an electrician or instructed staff under the guidance and supervision of
an electrician may work on electrical systems or operational equipment; they
must comply with the electrical industry rules while doing so.
Before starting work, disconnect live parts from power. Involve a second
person to activate the emergency stop in case of emergency.