General Information - ABB VA Master FAM540 Instrucciones Para La Puesta En Funcionamiento

Ocultar thumbs Ver también para VA Master FAM540:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 81
Startup Operation
5
Startup Operation
5.1

General information

General information
When using meter with fluids carefully remove the air to prevent gas bubbles.
When using meter with gases increase the flow pressure slowly.
Vary the flow with help of adjustable valves (control valves) to protect the float from pressure
shock waves. Otherwise, the flowmeter may be damaged.
The optional use of gas damping may not be used to compensate for shock waves.
Inspection prior to switching on auxiliary power
Prior to commissioning the unit, check the following:
The wiring is correctly implemented according to the connection diagram, see chapter
Electrical connection,
The flowmeter is grounded properly,
The ambient conditions meet specifications,
The auxiliary power must match information on the model plate.
Inspection after switching on auxiliary power
After commissioning perform the following step:
Check and configure the measurement parameters according to operating conditions.
20 - EN
VA Master FAM540
CI/FAM540-X1

Publicidad

Tabla de contenido
loading

Tabla de contenido