Commissioning

Commissioning is essential for the system, which can protect it against fires,
injury and electric shock.

4.1 Inspection before Commissioning

Check the following items before starting the inverter:
1.
All the installation sites are convenient for operation, maintenance and
service.
2.
Check and confirm that the inverter is firmly installed.
3.
Space for ventilation is sufficient for one inverter or multiple inverters.
4.
Nothing is left on the top of the inverter or battery pack.
5.
The inverter and accessories are correctly connected.
6.
Cables are routed in a safe place or protected against mechanical
damage.
7.
The selection of the AC circuit breaker is optimal.
8.
The terminals that are not used underneath the inverter are sealed.
9.
Warning signs and labels are suitably affixed and durable.

4.2 Button Instruction

The LCD display panel with a screen, an indicator and two buttons is on the
front of the inverter. Please refer to the following table before any operation of
the inverter.
Screen
Button
Indicator
Button
13

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sg3k-sSg3k-dSg4k-dSg5k-dSg6k-dSg8k3-d

Tabla de contenido