Lcd Operation; Main Screen - Sungrow SG2K-S Manual De Usuario Rápido

Ocultar thumbs Ver también para SG2K-S:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5 LCD Operation

5.1 Main Screen

After successful commissioning, the LCD screen will enter the main screen.
If there is no button operation for:
 1 minute, LCD backlight will be automatically deactivated;
 2 minutes, system will return to the default screen (main screen).
When there is no button operation for 8 seconds on the main screen, the LCD
screen will automatically go through the main screen and energy, PV and grid
interfaces, with each interface stayed for 2 seconds. Quit this mode by any
operation on any button.
Pac:
Status:
* The images shown here are for your reference only. For -D series, all PV input
information will be displayed.
Tab. 5-1 Status Description
State
Standby
Startup
Running
Turn off
Upgrading
16
3456W
Running
Grid Vtg:
221.7V
Grid Frq:
50.0Hz
Description
The inverter waits for sufficient sunlight, then the DC voltage
recovers.
The inverter is initializing and synchronizing with the grid.
After being energized, the inverter tracks the PV strings'
maximum power point (MPP) and feeds the AC power to grid.
This mode is the normal mode.
The inverter will stop running by manual "OFF" via the LCD
menu. Set to "ON" if you want to restart the inverter.
The DSP or LCD program is upgrading.
Inverter power
Inverter status
E-today:
20.0kWh
E-total:
1999kWh
Vpv:
250.0V
Ipv:
2.9A

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sg3k-sSg3k-dSg4k-dSg5k-dSg6k-dSg8k3-d

Tabla de contenido