4 Commissioning
Tab. 4-1 Button function
Button
Operation
≤1.2 s
ESC
>1.2 s
≤1.2 s
ENT
>1.2 s
Risk of burns due to hot components!
Do not touch any hot parts (such as heat sink) during operation. Only
the LCD panel and the DC switch can safely be touched at any time.

4.3 Commissioning Procedure

Make sure all the above mentioned items meet the requirements.
1.
Connect the external AC circuit breaker.
Rotate the DC switch to "ON".
2.
3.
If there is sufficient sunlight, the inverter will enter the running state and
start to feed AC power to the grid. The LCD screen will be activated 5s
later.
Startup
4.
Observe the status of the indicator.
Tab. 4-2 Indicator Status Description
Status
Steady on.
Green
Flash once every 1s.
Steady on.
Red
Flash
0.2s.
14
Description
Navigate up / down or change the setting values.
Hereinafter referred to as "Touch ESC".
Return to a previous menu or cancel the settings.
Hereinafter referred to as "Press ESC".
Move left or right, or turn pages, or view the active
error/warning from the main screen.
Hereinafter referred to as "Touch ENT".
Enter the sub-menu or confirm a selection or settings.
Hereinafter referred to as "Press ENT".
Pac:
80%
Status:
Description
The inverter is running normally, or with a
warning, or with power limitation.
Inverter status: Running.
The inverter is in the status of standby,
startup or Turn off (via LCD menu).
Inverter faults.
quickly
every
Grid faults.
3456W
Pac:
Standby
Status:
Quick User Manual
3456W
Running

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sg3k-sSg3k-dSg4k-dSg5k-dSg6k-dSg8k3-d

Tabla de contenido