Installation Requirements - Snap-On ATC 970S Manual De Instrucciones

Desmontador automático de neumáticos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
i.

Installation requirements

THE INSTALLATION SHALL BE CARRIED OUT
ONLY BY QUALIFIED PERSONNEL AND WITHIN
THE SCOPE OF THE INSTRUCTIONS PROVIDED
IN THIS MANUAL.
Install the machine in a covered and dry area.
Fig.i-1
The installation of the machine requires a free space
of at least 3x3 m (106"x106").
Make sure that from the operating position the user
can see all of the machine and the surrounding area.
The operator shall forbid, in such an area, the
presence of non authorized persons and of objects
which may create possible hazards.
WARNING: THE OPERATOR IS RESPONSIBLE FOR
MACHINE OPERATION AND FOR RESTRICTING
ACCESS TO THE WORK AREA.
WARNING: ONLY THE OPERATOR MAY ACCESS
THE WORK AREA.
i-1
The machine shall be installed on a horizontal fl oor,
preferably even. Do not install the machine on a
weak or irregular fl oor.If the machine is installed on
a raised fl oor, the fl oor must have a capacity of at
least 10000 N/m² (1000kg/m² or 205 lbsxsqft).
The device does not have to be fi xed to the ground.
48
- EN

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido