Conduct a test to ensure that there
are no gas leaks once the network
gate valve is open (Fig. 4).
Upon completion of the operations de-
scribe, close the network gate valve
(Fig. 3).
If it is necessary to replace the
nozzle to conform to another
type of gas supply, see the pro-
cedure described in the Operations for
commissioning (see chapter 5).
GAS TYPE CHANGE - see SECT.
IMAGES - REF. g)
The appliance comes from the
factory with setting to the type
of power indicated on the pla-
te. Any other configuration that chan-
ges the parameters set must be au-
thorized by the manufacturer or by
its representative.
The transformation from one type
of power to another must be per-
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
formed by qualified technical personnel
authorized to perform the operation in
question. The correct procedure to be
implemented for the transformation is
described in the relevant manual.
must be requested directly from the
manufacturer.
change the label on the appliance with
new the parameters reported on the
adhesive document provided.
attachment and one inside (see image
reference g).
- 12 -
Injectors - By Pass - Pilot injectors
- Apertures - and anything neces-
sary for any gas transformation
At the end of the transformation
from one type of power to another,
Two plates may need to be repla-
ced in certain cases (oven equip-
ment), one outside near the gas