Siemens 3AP1 FI Instrucciones De Servicio página 4

Tabla de contenido

Publicidad

1 Indice - Contents
4
4.1
4.2
4.2.1
4.2.2
4.2.3
4.3
4.3.1
4.3.2
4.4
4.5
4.5.1
4.5.2
4.5.3
4.5.4
4.5.5
4.5.6
4.5.7
4.5.8
4.6
4.6.1
4.6.2
4.6.3
4.7
4.7.1
cilindro
4.7.2
4.8
4.9
4.9.1
4.9.2
4.9.3
5
5.1
5.1.1
5.1.2
5.1.3
5.1.4
4
de un
6
6
41
4
Installation
41
4.1
Safety Rules for Installation
44
4.2
Delivery and Storage
44
4.2.1
Packing
44
4.2.2
Checking on Arrival
44
4.2.3
Storage
47
4.3
Cleaning Liquids, Lubricants and Cor-
rosion Protection Agents
47
4.3.1
Cleaning Liquids
48
4.3.2
Lubricants and Corrosion Protection
Agents
49
4.4
General Instructions for Installation
50
4.5
Installation of the Breaker
50
4.5.1
Assembly on Supporting Pillars at the
Place of Installation
51
4.5.2
Assembly Overview
52
4.5.3
Taking Apart the Shipping Unit
53
4.5.4
Leak Test on the Breaker Poles
54
4.5.5
Assembly of the Control Cubicle
55
4.5.6
Assembly of the Operating Mechanism
Cubicles
56
4.5.7
Installation of Pole Columns and Cou-
pling of the Operating Mechanisms
59
4.5.8
Connecting the Gas Pipes
61
4.6
Earthing and Connecting the Leads
61
4.6.1
Earthing
61
4.6.2
Work on High-Voltage Terminals
62
4.6.3
Connecting the Leads
64
4.7
Filling the Breaker with Gas
64
4.7.1
Filling the Breaker from the Gas Cylin-
der
66
4.7.2
Leakage Test after Installation
67
4.8
Carrying Out Test Operations
69
4.9
Checks before Commissioning
69
4.9.1
Anti-Condensation Heaters
69
4.9.2
Test of Wiring between Substation and
Circuit-Breaker
69
4.9.3
Commissioning Report
71
5
Operation
71
5.1
Instructions for Operation
71
5.1.1
Closing and Opening
71
5.1.2
SF
Pressure
6
72
5.1.3
72
5.1.4
41
41
44
44
44
44
47
47
48
49
50
50
51
52
53
54
55
56
59
61
61
61
62
64
64
66
67
69
69
69
69
71
71
71
71
72
72
927 10232 171 A

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido