Siemens SITRANS LR250 (HART) Manual De Inicio Rápido página 25

Ocultar thumbs Ver también para SITRANS LR250 (HART):
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 133
Configuring a new device
:
Notes
• Clicking on Cancel during an upload from device to SIMATIC PDM will result in some
parameters being updated.
• Application Guides for setting up HART devices with SIMATIC PDM can be downloaded
from the product page of our website at: www.siemens.com/LR250.
1)
Check that you have the most recent EDD, and if necessary update it (see
Electronic Device Description (EDD)
2)
Launch SIMATIC Manager and create a new project for the device.
3)
Open the menu Device – Master Reset and click on OK to perform a reset to Factory
Defaults.
4)
After the reset is complete, upload parameters to the PC/PG.
5)
Configure the device via the Quick Start wizard.
Quick Start Wizard via SIMATIC PDM
Notes:
• The Quick Start wizard settings are inter-related and changes apply only after you click on
FINISH AND DOWNLOAD at the end of the last step to save settings offline and transfer
them to the device.
• Click on BACK to return and revise a setting or Cancel to exit the Quick Start.
Launch SIMATIC PDM, open the menu Device – Wizard - Quick Start, and follow steps 1 to 5.
Operating via FDT (Field Device Tool)
FDT is a standard used in several software packages designed to commission and maintain
field devices. Two commercially available FDTs are PACTware
To configure a field device via FDT you need the DTM (Device Type Manager) for the device.
Siemens devices use SITRANS DTM and a device EDD written for SITRANS DTM.
1) First install SITRANS DTM on your system. You can download it from:
http://www.siemens.com/automation/service&support. Click on Product Support, and
navigate to Product Information/Automation Technology/Sensor systems/Process
Instrumentation/Software & Communications.
2) Install the SITRANS LR250 HART EDD for SITRANS DTM. You can download it from the
product page of our website at: www.siemens.com/LR250. Go to Support > Software
Downloads.
Configuring a new device via FDT
The full process to configure a field device via FDT is outlined in an Application Guide that can
be downloaded from the product page of our website under Support > Application Guides.
A5E31997170
on page 22).
Quick
Start
SITRANS LR250 (HART) – QUICK START MANUAL
Update
TM
and Fieldcare.
Page EN-23

Publicidad

Tabla de contenido
loading

Tabla de contenido