Installation Of Wall-Mounted Enclosure - Grundfos Conex DIA-2Q Manual De Instrucciones

Ocultar thumbs Ver también para Conex DIA-2Q:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 156

9.5 Installation of wall-mounted enclosure

Warning
Switch off the power supply before
installing!
Enclosure class IP65 is only guaranteed if
the terminal cover is correctly sealed, if the
front panel of the terminal enclosure is
closed and the appropriate cable glands or
dummy caps fitted.
Do not damage the terminal cover gasket!
Caution
The terminal cover gasket must fit exactly!
10.5
Fig. 6
Wall-mounted enclosure Conex
DIA-2Q
1. Drill three holes (8) as shown in the diagram,
and insert the supplied dowels.
2. Screw the screw (A) into the top centre dowel
until it projects by approximately 1 cm. See fig. 7.
3. Loosen the fastening screws of the front panel,
and remove the front panel.
4. Hang the instrument onto the screw (A).
5. Tighten the instrument with the two screws (B).
6. Mount the front panel of the enclosure.
B
Fig. 7
Mounting drawing
16
198
®
A
B

Publicidad

Tabla de contenido
loading

Tabla de contenido