Rete
Rete
elettrica
elettrica
1
1
When the battery charge indicator ( ref. Pag. 14 " Tiller Head" n° 5) has only a Led lights
When the battery charge indicator ( ref. Pag. 14 " Tiller Head" n° 5) has only a Led lights
is necessary to charge the battery as follows:
is necessary to charge the battery as follows:
A)
A)
Disconnect the start key (rif. Pag. 14 "Instruments" n° 1).
Disconnect the start key (rif. Pag. 14 "Instruments" n° 1).
B)
B)
Connect the cable (1) to the internal battery charger (5) and then connect it to the
Connect the cable (1) to the internal battery charger (5) and then connect it to the
supply mans with a socket type "SCHUKO" of 220V 10 A avoiding the use of electric
supply mans with a socket type "SCHUKO" of 220V 10 A avoiding the use of electric
adaptors.
adaptors.
C)
C)
Verify on the RED LED (2) if the charge process start.
Verify on the RED LED (2) if the charge process start.
Disconnect the cable (1) from the supply mains to stop the charge process when the
Disconnect the cable (1) from the supply mains to stop the charge process when the
battery charge is full.
battery charge is full.
The charge process is composed as follows:
The charge process is composed as follows:
The battery charger is active with the connections of the supply plug at the socket
The battery charger is active with the connections of the supply plug at the socket
!
!
of the socket of supply mains; in this stage the RED LED is lighted (2). During the
of the socket of supply mains; in this stage the RED LED is lighted (2). During the
START-UP period the internal relay is open so the battery is disconnect from the
START-UP period the internal relay is open so the battery is disconnect from the
battery charger for more safety. Then there is the check of the battery voltage
battery charger for more safety. Then there is the check of the battery voltage
.The internal relay close itself and start the charge process with a soft rise of the
.The internal relay close itself and start the charge process with a soft rise of the
current (soft-start) da zero ampere to the planed value.
current (soft-start) da zero ampere to the planed value.
The YELLOW LED (3) is lighted during the final period of the battery charge.
The YELLOW LED (3) is lighted during the final period of the battery charge.
!
!
At the end of the battery charge the GREEN LED (4) is lighted.
At the end of the battery charge the GREEN LED (4) is lighted.
!
!
Are shown the fallowing failure with the RED LED flashed
Are shown the fallowing failure with the RED LED flashed
- Internal thermostat
- Internal thermostat
- Time-out of the process
- Time-out of the process
- Short circuit
- Short circuit
During a failure period, the internal relay is open the battery is disconnect from the
During a failure period, the internal relay is open the battery is disconnect from the
battery charger for more safety.
battery charger for more safety.
In the case of the battery charger doesn't work verify the fuse (6) and change it if is fused.
In the case of the battery charger doesn't work verify the fuse (6) and change it if is fused.
W12
BATTERY CHARGE
BATTERY CHARGE
INTERNAL BATTERY CHARGER FRONTAL PANEL
INTERNAL BATTERY CHARGER FRONTAL PANEL
6
6
16
16
5
5
2
2
3
3
4
4
Fuse: F8A universal input
Fuse: F8A universal input
Do not remove the cover
Do not remove the cover
Danger of electric shocks
Danger of electric shocks
UK16